|
E1-306 EITC Phone: (204) 474-9535
|
• Watershed Modelling
• Model Calibration
• River-Reservoir Systems Operation
• Uncertainty Analysis in River-Reservoir Systems Operation
• Water Distribution System Analysis and Optimal Design
• Heuristic Optimization and Algorithm Development and Testing
• High Performance Computing and its Application in Water Resources Engineering
• Asadzadeh M., Leon L., Yang W., Bosch D., 2016. One-day offset in daily hydrologic modeling: An exploration of the issue in automatic model calibration. Journal of Hydrology, Volume 534, pp. 164-177, ISSN 0022-1694, http://dx.doi.org/10.1016/j.jhydrol.2015.12.056.
• Asadzadeh M., Leon L., McCrimmon R. C., Yang W., Liu Y., Wong I., Fong P., Bowen G., 2015. Watershed derived nutrients for Lake Ontario inflows: Model calibration considering typical land operations in Southern Ontario. Journal of Great Lakes Research, 41(4), pp. 1037-1051, ISSN 0380-1330, http://dx.doi.org/10.1016/j.jglr.2015.09.002.
• Asadzadeh M., Tolson B. A., Burn D. H., 2014. A New Selection Metric for Multi-Objective Hydrologic Model Calibration. Water Resources Research, 50(9), pp. 7082–7099, doi:10.1002/2013WR014970.
• Asadzadeh M., Razavi S., Tolson B. A., and Fay D., 2014. Pre-emption strategies for efficient multi-objective optimization: Application to the development of Lake Superior regulation plan. Environmental Modelling & Software, Volume 54, April 2014, pp. 128-141, doi:10.1016/j.envsoft.2014.01.005.
• Asadzadeh M., and Tolson B. A., 2013. Pareto Archived Dynamically Dimensioned Search with Hypervolume Based Selection for Multi Objective Optimization. Engineering Optimization, 45(12), pp. 1489-1509, doi:10.1080/0305215X.2012.748046.
• CIVL 2780: Civil Engineering Systems
• CIVL 7090: Water Resrouces Systems
Comprehensive CV- Masoud Asadzadeh