Safe Job Procedures for Physical Plant
  1. Generic - All Shops (Under Review)
  2. Administrative Services
  3. Architectural Services
  4. Architectural Shop
  5. Bannatyne
  6. Caretaking
  7. Central Energy Plant
  8. Controls - Refrigeration
  9. Electrical Shop
  10. Elevator Shop
  11. Engineering Services
  12. General Services
  13. Machine Shop
  14. Mail Services-Central Stores
  15. Plumbing Shop
  16. Sustainability

 


 

 1. Generic-All Shops

Asbestos Decontamination - Fort Garry

Asbestos Decontamination - Glenlea

Confined Space Entry - Level B

Confined Space Entry - Level C

Decommissioning Lab Equipment

Entering Laboratories to Provide Maintenance - Service

Fall Protection

Fire Alarm - Sprinkler Shutdown Fort Garry

Full Incident Electronic Version

Fume Hood Repairs and Servicing

Fumehood Usage - Malfunction Animal Science

Genie TMZ 50-30 - Fort Garry

Hot Work - Fort Garry

Incident Investigations

Lightning SJP

Lockout Tagout - Fort Garry

Outfall & Lift Station Opening, Closing & Entrance

Panic Alarm in the Central Energy Plant

Panic Alarm on the Two Way Radio

Portable Grinders

Power Hammer Drill for Silica

Power Hammer Drill for Silica - Filter Replacement

System Shutdown Procedures

Back to top

 


 

2. Administrative Services

2.1 Maintaining a Safe & Healthy Office environment

2.2 Working in Isolation

 


 

3. Architectural Services

3.1 Working in Isolation - Architectural Services

 


 

4. Architectural Shop

4.1  Asbestos Ceiling Tile Removal

4.2  Band Saw

4.3  Hanging Articles

4.4  Ladders and Scaffolds

4.5  Lift Transport #82 JLG 20MVL

4.6  Moving Materials

4.7  Paint Gun Cleaning

4.8  Paint Spraying Application

4.9  Power Failure

4.10 Power Hand Tools

4.11 Suspended Ceiling

4.12 Using Jigs-Making Wood Wedges

4.13 Working in Isolation

 


 

 

5. Bannatyne

5.1  Asbestos Decontamination-Bannatyne

5.2  BMSB Intersitial Space

5.3  Confineed Space Entry

5.4  Fire Alarm-Sprinkler Shutdown Bannatyne

5.5  Fume Hood Repairs-BMSB

5.6  Good Shop Practice

5.7  Hot Work for Bannatyne

5.8  Lockout Tagout for Bannatyne

5.9  Plaster Trap Cleaning

5.10 Power Failures

5.11 Power Hand Tool Safety

5.12  Working in Isolation

 


 

6. Caretaking

6.1  Adding Chemicals to the Pool

6.2  Auto Scrubber

6.3  Wet Battery Charging

6.4  Bleachers

6.5  Blood and Body Fluid Cleanup

6.6  Building Lockup

6.7  Burnisher

6.8  Calcium Hypochlorite (Adding to Pool)

6.9  Cardboard Compactor

6.10 Cleaning Grey Garbage Bins with Pressure Washer 

6.11 Cleaning Upholstered Stacking Chairs

6.12 Cleaning Voice Data Rooms

6.13 Concrete Floors in Classrooms

6.14 Dolphin Robotic Pool Vacuum Cleaning

6.15 Eye/Face Wash Station Inspection

    6.15.1 Fire Extinguisher Inspection

6.16 Folding Tables, Stacking Chairs, Moveable Walls

6.17 Garbage Compactor

6.18 Graffitti Removal

6.19 Hand Washing

6.20 High Speed Floor Polisher and Floor Stripping

6.21 Hydroxan to Wapotec System

6.22 Ice Chipping

6.23 Ice Resurface Machine

    6.23.1 Blade Change on Ice re-Surfacer

    6.23.2 Ice Rink Edger Machine

6.24 Ice Rink Glass Removal and Installation

6.25 Kaivac Cleaning System

6.26 Laboratory Cleaning Safely

6.27 Loading and Transporting Garbage

6.28 Max Bell Ice Rink Removal

6.29 Moot Court Operable Wall

6.30 Moving Furniture and Equipment

6.31 Swimming Pool Scum Line Removal

6.32 Tabex Clear-It to Wapotec System 

6.33 Working In Isolation

6.34 Working In Shower or Locker Room Areas

6.35 Cleanup of Rodent Droppings and Nests

6.36 Lice Contamination Cleanup

6.37 Glycol Spill Cleanup  

6.38 Cleaning Flooded Areas

6.39 Fire Extinguisher Discharge Clean Up

  

 

 7. Central Energy Plant

7.1  Battery Charging for Caterpillar Forklift

7.2  Elevator Service Calls

7.3  Evacuation-Mustering Point

7.4 Eyewash Station Maintenance

7.5  Filling Battery Cells for Forklift

7.6  Forklift Operation - EP16KT

7.7 Setup and Use of Floor Opening in the Central Energy Plant

7.8  Loading and Unloading Trucks with Caterpillar EP16KT Forklift

7.9  Power Failure

7.10 Refrigerant Alarm in the CEP

7.11 Working in Isolation

7.12 Operation of Oil Accumulator on Ammonia Ice Plant

7.13 Operation of Man Lift

 


 

8. Controls-Refrigeration Shop

8.1  Annual Maintenance of CEP Chillers

8.2  Asbestos Ceiling Tile Removal

8.3  Moving Material Safely

8.4  Power Failure

8.5  Power Hand Drill Safety

8.6  Power Hand Tool Safety

8.7  Seasonal Draining and Filling Coils

8.8  Using a Pedestal Grinder

8.9  Working in Isolation

8.10 Working in Mech Room with Reduced Lighting

 


 

9. Electrical Shop

9.1  Bucket Truck Lighting

9.2  Hi Bay Lamp Changing - Ballast Replacement

9.3  Lift Transport #82 JLG 20MVL

9.4  Power Outage at Fort Garry

9.5  Working in Isolation

9.6 Kontrol Kube

 


 

10. Elevator Shop

10.1  Car Top Safety-Access Exit

10.2  Car Top Safety-Safety Precautions

10.3  Dumbwaiters

10.4  Electrical Safety

10.5  Fall Protection

10.6  Machine Room Safety

10.7  Pit Safety

10.8  Power Failure

10.9  Proper Use of Jumpers

10.10 Stalled-Malfunctioning Elevator

10.11 Working in Isolation


 

11. Engineering Services

11.1  Engineering Services Working in Isolation


12. General Services

12.1  #17A Western 10' Ice Breaker Hopper Spreader 

12.2  #43 Disability Services-Transport Vehicle

12.3  Coats 40-40 as Tire Machine

12.4  #204 Citation parts Washer- Autoshop

12.5  #206 Stihl Gas Powered Quick Saw

12.6  #208 Dewalt DW 750 HD Bench Grinder

12.7  Battery Checking-Replacing in a Light Passenger Vehicle

12.9  Feeding a Brush Chipper

12.10 Extinguisher Annual Inspection

12.11 Fire Hose Annual Inspection

12.12 Flag Person-Traffic Control

12.13 Fork Lift Operation

12.15 Handling Bird Excrement

12.17 Loader Blade Attachment

12.18 Loader Boom Attachment

12.19 Loader Bucket Attachment

12.20 Loader Fork Attachment

12.21 Loading Garbage into Front End Loader Bucket

12.22 Loading and Unloading Trucks with Forklift

12.23 Operating Steamer Pressure Washer to Remove Ice

12.24 Operating Aerial Truck Mounted Device

12.25 Operating power Tailgate

12.26 Operating Vehicles on Campus

12.27 Proper Mounting-Dismounting of Equipment

12.28 Power Outage

12.29 Refueling Vehicles

12.30 Snow Shovelling

12.31 Transporting Lifts

12.32 Using Vehicle Hoist for Service Repair-Autoshop

12.33 Working in and Around the Garage Pit

12.34 Working in Isolation

12.35 Skid Steer Loader and Attachments

12.36 Hand Power Tools

12.37 Agricultural, Industrial and Turf Tractors

12.38 Utility Vehicles and Attachments

12.39 Tiger Torch


 

13. Machine Shop

13.1  Good Shop Practices

13.2  Power Failure

13.3  Sandblaster

13.4  Working in Isolation


 

14. Mail Services-Central Stores

14.1  Battery Charging for Caterpillar

14.2  Filling Battery Cells

14.3  Fork Lift Operation

14.4  Handling of Chemicals

14.5  Loading and Unloading Trucks with Forklift

14.6  Re-filling Mini-Max Strapping Machine

14.7  Spilled Chemicals

14.8  Using the Mini-Max Strapping Machine

14.9  Working in Isolation


15. Plumbing Shop

15.1  Drill Press

15.2  Fire Hydrant Inspection, Testing and Maintenance

15.3  Forklift Operation Environmental Safety Building

15.4  General Drain-Rooter

15.5  General Power Vee

15.6  General's Jet Set J-1600 Jetter

15.7  Gen-Eye 3

15.8  Good Shop Practice

15.9  Lab Trap Removal

15.11 Maxi-Rooter

15.12 Mini-Rooter

15.13  Portable Freeze Machine

15.14 Power Failure

15.15 Steam Pits Opening-Closing

15.16 Vacuum Piping

15.17 Victaulic Manual Roll Groover #VE26

15.18 Victaulic Roll Groover Model VE226

15.19 Working in Isolation

15.20 Operation of RIGID 535 Threader

15.21 Glycol Spill Response

15.22 Steam Trap


 

16. Sustainability

16.1  Dumping Recycling Into Front Load Bin from Lift Gate of Cube Van

16.2  Loading Recycling Bins On-Off Cube Van

Safe Job Procedure Development (click to download) 

Instructions:

Step 1 - Critical Job Inventory

Step 2 - Job Hazard Analysis 

Step 3 - Safe Job Procedure Development

 

Templates:

 

Equipment Emergency Response Plan

Job Hazard Analysis 

Safe Job Procedure