University of Manitoba

U of M - Campus Services - Physical Plant - Architectural and Engineering Master Specification Docs

Architectural and Engineering Master Specification Docs

 Reference #  Specification Title

 Revision Date

 

 COMMISSIONING

 
   U of M - Spec Cover  Oct 18-11
   Under 60,000.00 Index  Oct 18-11
 00200  Instructions to Bidders  Oct 18-11
 00301  Separate Prices  Oct 18-11
 00302  Alternate Price  Oct 18-11
 00303   Itemized Prices  Oct 18-11
 00800  Supplementary Conditions  Oct 18-11
 01005  General Instructions  Oct 18-11
 01330  Submittal Procedures  Oct 18-11
 01380  Construction Photographs  Oct 18-11
 01450  Quality Control  Oct 18-11
 01555  Emergency Procedures for Contractors  Oct 18-11
 01705  Health and Safety  Oct 18-11
 01770  Closeout Procedures  Oct 18-11
 01770  Closeout Procedures Appendix  Oct 18-11
 01780  Closeout Submittals  Jul 28-09
 01810  Standard Commissioning Specification  Feb 09-12
 Sample Forms    
   Sample Building Commissioning Plan  May 12-09
   Sample Mechanical Commissioning Forms  Oct 15-09
   Sample Electrical Commissioning Forms  Oct 15-09
   ISR blank  Oct 15-09
   ISR CS Ex welcome Ctr  Oct 15-09
   ISR East Zone Ventilation  Oct 15-09
   ISR Fire protection Welcome Ctr  Oct 15-09
   ISR hydronic HeatingWelcome Ctr  Oct 15-09
   ISR steam condensate Welcome Ctr  Oct 15-09
   ISR Ventilation  Oct 15-09
 

 MECHANICAL

 
 15000  Basic Mechanical Design Guidelines  May 7-12
 15010  Mechanical General Provisions  Mar 28-11
 15020  Accepted Manufacturers  Jul 12-11
 15030  Precast Utility System  Jan 10-06
 15050  Basic Materials and Methods  May 23-12
 15100  Duct Cleaning  Jan 10-06
 15180  Insulation  Mar 28-11
 15200  Chemical Treatment  Mar 28-11
 15300  Site Services -                               22 Drawings  Jan 10-06
 15400  Plumbing -                                   107 Drawings  Apr 12-11
 15500  Fire Protection -                             15 Drawings  Dec 20-11
 15700  Heating & Cooling -                        28 Drawings  Apr 10-12
 15725  Variable Speed Drives  Jul 05-11
 15800  Air Distribution -                            70 Drawings  Jul 05-11
 15860  Sound & Vibration Isolation  Mar 28-11
 15900  Controls General Requirements  May 7-12
 15910  Controls Field Work  Jan 12-11
 15920  Controls Panels  Jul 21-08
 15930  Controls Drawings  Apr 24-08
 15950  Controls Sequences of Operation  Apr 24-08
 15990  Testing and Balancing  Mar 28-11
 

 ELECTRICAL

 
 Index for Master Electrical Spec.  Feb 08-12
 16000  Basic Electrical Design Guidelines  Feb 08-12
 16050  Basic Electrical Materials & Methods  Feb 08-12
 16107  Direct Buried Underground Cable Ducts  Feb 08-12
 16110  Wireways  Feb 08-12
 16111  Conduit  Feb 08-12
 16112  Communication Cabling Raceways  Feb 08-12
 16114  Cable Tray  Feb 08-12
 16120  Wire and Cable  Feb 22-12
 16126  Fastenings & Supports  Feb 08-12
 16127  Underground Duct Bank  Feb 08-12
 16128  Underground Conduit & Cables  Feb 08-12
 16131  Cabinets, Splitters, Junction & Pull Boxes  Feb 08-12
 16134  Outlet Boxes and Fittings  Feb 08-12
 16140  Wiring Devices  Feb 08-12
 16145  Car Heater Receptacle  Feb 08-12
 16151  Mechanical Equipment  Feb 08-12
 16155  Motor Starters  Feb 08-12
 16157  Motor Control Centers  Feb 08-12
 16160  Panelboards  Feb 08-12
 16161  Panelboards - Isolated Ground  Feb 08-12
 16165  Contactors  Feb 08-12
 16170  Motor and Circuit Disconnects  Feb 08-12
 16181  Fuses  Feb 08-12
 16182  Circuit Breakers  Feb 08-12
 16183  Misc Apparatus & Appliances  Feb 08-12
 16184  Elevator Wiring  Feb 08-12
 16203  Work in Existing Building  Feb 08-12
 16321  Dist Transformers - Liquid Cooled Ex Mounted  Feb 08-12
 16401  Services to the Building  Feb 08-12
 16404  Main Distribution Switchboard  Feb 08-12
 16411  High Voltage Switchgear Distribution  Feb 08-12
 16444  Bus Ducts  Feb 08-12
 16451  Grounding  Feb 08-12
 16460  Dry-Type Distribution Transformers  Feb 08-12
 16461  Electric Equipment Vibration Isolation  Feb 08-12
 16470  Sprinkler-Proof Equipment  Feb 08-12
 16500  Lighting  Feb 08-12
 16510  Lighting Control Equipment - Low Voltage  Feb 08-12
 16519  Exit Sign  Feb 22-12
 16519  Pictogram Exit Sign  Feb 08-12
 16534  Card Access System  Feb 08-12
 16535  Unit Equipment for Emergency Lighting  Feb 08-12
 16550  Site Lighting  Feb 08-12
 16613  Standby Generator  Feb 08-12
 16701  Communication Raceways  Feb 08-12
 16710  Indicating Clocks  Feb 08-12
 16718  Classroom Sound System  Feb 08-12
 16720  Audio, Video & Control Data  Feb 08-12
 16723  Fire Alarm System Addressable Single Stage  Feb 08-12
 16723  Fire Alarm System Addressable Two Stage  Feb 08-12
   Voice Data Drawings  Feb 08-12
 16740  Voice Data Riser Systems Copper  Feb 08-12
 16741  Voice Data Copper-Cat 6  Feb 08-12
 16742  Voice Data Systems Fibre Optic  Feb 08-12
 16743  Voice Data Rooms  Feb 08-12
 16745  Copper CCTV Systems  Feb 08-12
 16746  Copper Wallphone Systems  Feb 08-12
 16747  Copper Delta Systems  Feb 08-12
 16748  Cable Removal  Feb 08-12
 16749  Computer Labs  Feb 08-12
 16765  Closed Circuit TV System  Feb 08-12
 16791  Hearing Assistance System  Feb 08-12
 16851  Electric Heating and Controls  Feb 08-12
 16995  Electrical Commissioning  Feb 08-12




© 2012 UNIVERSITY OF MANITOBA
Physical Plant
Winnipeg, MB, Canada R3T 2N2
University of Manitoba, Winnipeg, MB  R3T 2N2 Canada