EHSO home page

PINCHIN ENVIRONMENTAL
ASBESTOS BUILDING ASSESSMENT
OF
THE UNIVERSITY OF MANITOBA

August 9, 2002

 

Appendix III
Buildings Excluded From Audit

 

The following buildings were constructed after 1986 and will not be included in the audit portion of the survey:

Animal Science Research Unit (1991)
Brodie Centre (1995)
Campus Day Care Centre (1991)
C.A.S.T. Building (2001)
Drake Centre (1987)
Grain Storage Research Laboratory (2001)
Helen Glass Centre for Nursing (1999)
Investor Group Athletic Centre (1989)
Max Bell Centre Link (1989)
Parkade (1999)
Physical Plant Compound (2001)
Drake Centre Tunnel (1987)
S.E. Tunnel (1991)
C.S. Tunnel (1991)
C.W. Tunnel (1991)
N.C. Tunnel (1991)
C. Tunnel (1991
)

   
  The following buildings have been previously surveyed and will not be included in the audit portion of the survey:

Basic Medical Science Building (June 1995)
Bio-Systems Engineering (Nov. 2001)
Buller Building (Nov. 1998)
Chown Building (Dec. 1998)
Duff Roblin 1 (May-July 2000)
Duff Roblin 2 (May-July 2000)
Elizabeth Dafoe Library 1 (May-Sept. 2000)
Elizabeth Dafoe Library 2 (May-Sept. 2000)
Elizabeth Dafoe Library 3 (May-Sept. 2000)
Engineering 1 (Nov. 2001)
Engineering 2 (Nov. 2001)
Engineering 3 (Nov. 2001)
Faculty of Education (February 2002)
Fletcher Argue 1 (July-Sept. 2000)
Fletcher Argue 2 (July-Sept. 2000)
Human Ecology (May-Aug. 2000)
Isbister (April 1998)
Mary Speechly (Aug. 1998)
McMath High Voltage Lab (Nov. 2001)
Medical Library (March 1999)
Pathology (July 1999)
Pembina Hall (Aug. 1998)
Services Building (Nov. 2001)
Tache Hall Central (Aug. 1998)
Tache Hall East (Aug. 1998)
Tache Hall West (Aug. 1998)
Tier Building (March-April 1998)

 

Questions or Comments? Contact webmaster: Paul Houle, (204) 474-6316