University of Manitoba

U of M - Administration - Vice President (Administration) - CCD - Older Posts

Older Posts

May 12, 2010
                               * * *    NOISE ALERT    * * *

Noise levels at the Pembina Hall Residence construction site will increase significantly from Wednesday May 12th – Friday May 21st . The heavy pounding and drilling will occur throughout the day from 8:30 am – 5:30 pm on these days inclusive.

March 15, 2010

Residence and ART Lab Construction Advisory

  • Effective Wednesday, March 17th 2010 the tunnel from the Drake building to the Tier Building will be closed until ART Lab construction is complete. The blue dotted line below outlines alternate pedestrian routes.
  • The sidewalk along the east side of Alumni Lane will be open for pedestrian traffic on Wednesday March 17th.
  • The north exit door to Dafoe is no longer accessible (for exiting only).

 




© 2017 UNIVERSITY OF MANITOBA